• <ruby id="5koa6"></ruby>
    <ruby id="5koa6"><option id="5koa6"><thead id="5koa6"></thead></option></ruby>

    <progress id="5koa6"></progress>

  • <strong id="5koa6"></strong>
    • 軟件測試技術
    • 軟件測試博客
    • 軟件測試視頻
    • 開源軟件測試技術
    • 軟件測試論壇
    • 軟件測試沙龍
    • 軟件測試資料下載
    • 軟件測試雜志
    • 軟件測試人才招聘
      暫時沒有公告

    字號: | 推薦給好友 上一篇 | 下一篇

    在軟件測試中使用度量技術(英)

    發布: 2011-3-16 09:18 | 作者: 不詳 | 來源: 領測軟件測試網采編 | 查看: 156次 | 進入軟件測試論壇討論

    領測軟件測試網

      Metrics Used In Testing   軟件測試

      Metrics Used In Testing

      In this tutorial you will learn about metrics used in testing, The Product Quality Measures - 1. Customer satisfaction index, 2. Delivered defect quantities, 3. Responsiveness (turnaround time) to users, 4. Product volatility, 5. Defect ratios, 6. Defect removal efficiency, 7. Complexity of delivered product, 8. Test coverage, 9. Cost of defects, 10. Costs of quality activities, 11. Re-work, 12. Reliability and Metrics for Evaluating Application System Testing.

      Sponsored Links

      The Product Quality Measures:

      1. Customer satisfaction index

      This index is surveyed before product delivery and after product delivery

      (and on-going on a periodic basis, using standard questionnaires).The following are analyzed:

      •Number of system enhancement requests per year

      •Number of maintenance fix requests per year

      •User friendliness: call volume to customer service hotline

      •User friendliness: training time per new user

      •Number of product recalls or fix releases (software vendors)

      •Number of production re-runs (in-house information systems groups)

      2. Delivered defect quantities

      They are normalized per function point (or per LOC) at product delivery (first 3 months or first year of operation) or Ongoing (per year of operation) by level of severity, by category or cause, e.g.: requirements defect, design defect, code defect, documentation/on-line help defect, defect introduced by fixes, etc.

      3. Responsiveness (turnaround time) to users

      •Turnaround time for defect fixes, by level of severity

      •Time for minor vs. major enhancements; actual vs. planned elapsed time

      4. Product volatility

      •Ratio of maintenance fixes (to repair the system & bring it into compliance with specifications ), vs. enhancement requests (requests by users to enhance or change functionality)

      5. Defect ratios

      •Defects found after product delivery per function point.

      •Defects found after product delivery per LOC

      •Pre-delivery defects: annual post-delivery defects

      •Defects per function point of the system modifications

    延伸閱讀

    文章來源于領測軟件測試網 http://www.kjueaiud.com/

    TAG: index 軟件測試

    41/41234>

    關于領測軟件測試網 | 領測軟件測試網合作伙伴 | 廣告服務 | 投稿指南 | 聯系我們 | 網站地圖 | 友情鏈接
    版權所有(C) 2003-2010 TestAge(領測軟件測試網)|領測國際科技(北京)有限公司|軟件測試工程師培訓網 All Rights Reserved
    北京市海淀區中關村南大街9號北京理工科技大廈1402室 京ICP備2023014753號-2
    技術支持和業務聯系:info@testage.com.cn 電話:010-51297073

    軟件測試 | 領測國際ISTQBISTQB官網TMMiTMMi認證國際軟件測試工程師認證領測軟件測試網

    老湿亚洲永久精品ww47香蕉图片_日韩欧美中文字幕北美法律_国产AV永久无码天堂影院_久久婷婷综合色丁香五月

  • <ruby id="5koa6"></ruby>
    <ruby id="5koa6"><option id="5koa6"><thead id="5koa6"></thead></option></ruby>

    <progress id="5koa6"></progress>

  • <strong id="5koa6"></strong>